Stanford, CA
Stanford Adult Hospital
Healthcare
|
AMCs
Owner Stanford Medical Center
Architect Rafael Viñoly Architects
Expertise
MEP Engineering,
Sustainability & Resilience Consulting
Completion Date 2018
Size 824,000sf
Construction Cost $1.25B
Certifications/Awards 2020 ENR Best Project – Health Care, CA
Challenge
The original Stanford Hospital, built in 1959, no longer meets the needs of modern patients. Located in Silicon Valley, the new hospital opened in December 2019 with a design adaptable for future expansion and technologies. The challenge was to create a facility that could accommodate future growth while integrating cutting-edge systems and sustainability practices.
Solution
The new hospital is designed as a horizontally organized, modular medical center with impressive systems. Key features include:
Outcome
The new Stanford Hospital sets new standards in healthcare with its innovative design and sustainable practices. The hospital’s resilience is enhanced with each utility backed up at a minimum of N+1, capable of fully operating for over 96 hours independently. The advanced filter design allows air systems to switch from 100% outside air to 100% recirculation, providing protection against hazards like wildfires or internal airborne pathogens. During the COVID-19 pandemic, patient rooms were easily converted to quarantine surge space, demonstrating the hospital’s adaptability and resilience.